BPAC Documents
Contents
- Durham Department of Transportation
- BPAC Bylaws
- BPAC Annual Reports
- BPAC Minutes
- BPAC Resolutions
- BPAC Letters
- BPAC Press Releases
- BPAC Interlocal Agreement
- Ordinances
- Transportation Plans
- Transportation Corridor Studies
1. Durham Department of Transportation
Forms and planning documents of the Durham Department of Transportation are posted here.
2. BPAC Bylaws
3. BPAC Annual Reports
- 2010 Annual Report
- 2009 Annual Report
- 2008 Annual Report
- 2007 Annual Report
- 2006 Annual Report
- 2005 Annual Report
- 2004 Annual Report
4. BPAC Minutes
2011
| Jan. | Feb. | Mar. | Apr. | May | June | July | Aug. | Sep. | Oct. | Nov. | Dec. |
2010
|
Jan. |
Feb. |
Mar. |
Apr. |
May. |
Jun. |
Jul. |
Aug. |
Sep. |
Oct. |
|
January - Retreat |
2009
|
Jan. (snow cancellation) |
Feb. |
Mar. |
Apr. |
May |
Jun. |
Jul. |
Aug. |
Sep. |
Oct. |
Nov. |
Dec. |
|
February - Retreat |
2008
|
Jan. |
Feb. |
Mar. |
Apr. |
May |
Jun. |
Jul. |
Aug. |
Sep. |
Oct. |
Nov. |
Dec. |
|
January - Retreat |
2007
|
Jan. |
Feb. |
Mar. |
Apr. |
May |
Jun. |
Jul. |
Aug. |
Sep. |
Oct. |
Nov. |
Dec. |
|
March - Retreat |
2006
| Jan. | Feb. | Mar. | Apr. | May | Jun. | Jul. | Aug. | Sep. | Oct. | Nov. | Dec. |
2005
| Jan. | Feb. | Mar. | Apr. | May | Jun. | Jul. | Aug. | Sep. | Oct. | Nov. | Dec. |
2004
| Jan.| Feb.| Mar.| Apr.| May | Jun. | Jul. | Aug.| Sep. | Oct. | Nov. | Dec. |
5. BPAC Resolutions
2011
- Resolution to Support the Passage of the Transit Sales Tax Referendum., September 20, 2011
2010
- Resolution to Support the City of Durham’s Application for a DOT TIGER II and HUD Community Challenge Grant., September 21, 2010
2008
- Resolution to maintain bicycle and pedestrian access along Maxwell and Sumter Streets., December 16, 2008
2006
- Resolution for Pedestrian Plan Adoption (unsigned copy) , April, 2006
- Connectivity Resolution (unsigned copy) , April 18, 2006
- DOST Open Space Resolution (draft)
6. BPAC Letters
2011
2010
- Letter to Aaron Cain, Durham City-County Planning Department and Lisa Miller, Durham City-County Planning Department re: Ninth Street Design District Text Amendment: Bicycle Parking Requirement . December 16, 2010
- Letter to Mayor Bell and Durham City Council Members, Chairman Page and Durham County Commissioners re: Proposed Closing of the Gravel Portion of Pickett Road. December 16, 2010
- Letter to Ed Venable, Manager, Engineering & Stormwater Division and Mark Ahrendsen, Director, Durham Transportation Department re: 2010 Street Bond Referendum and Bicycle Facilities in Durham. November 16, 2010
- Letter to Mark Ahrendsen, Director, Durham Transportation Department re: Proposed Pedestrian Improvements on Club Blvd. October 19, 2010
- Letter to Ed Venable, Manager, Engineering and Stormwater Division, City of Durham re: Swing Gates on Phase E of American Tobacco Trail October 19, 2010
- Letter to Durham Board of County Commissioners and Durham City Council re: NC 54 Corridor Study - Draft Report October 19, 2010
- Letter to NCDOT and Durham Transportation re: New Bicycle Facilities on West Chapel Hill St. and University Dr./Lakewood Ave September 21, 2010
- Letter to NC Representatives & Senators regarding House Bill 1686, Bicycle Safety Changes May 24, 2010
- Letter to NCDOT Recommending Additional Pedestrian Facilities as Part of the East End Connector (U-0071) May 17, 2010
- Letter to Planning Commission Re: UDO Text Amendment for Bicycle Parking and Alternative Pedestrian Plans April 20, 2010
2009
- Letter to Planning Department on Bike Lane Widths along Westpoint on 751 Development., December 16, 2009
- Letter to NC DOT and Durham Transportation Manager on Stimulus Funds and Bicycle Facilities in Durham., December 04, 2009
- Letter to Durham Engineering Manager and Transportation Manager re-design of the Downtown Loop., November 18, 2009
- Letter to Board of Education on School Site Selection and Bicycle/Pedestrian Ammenities at Schools., November 17, 2009
- Letter to Planning Commission on Downtown Zoning and UDO Changes., November 10, 2009
- Response to BPAC Letter on Driveway Standards., October 22, 2009
- Letter to UNC Highway Safety Research Center re: support for NHTSA project on pedestrian safety., July 21, 2009
- Letter to Durham Engineering Manager re: adhering to the adopted Durham Comprehensive Bicycle Transportation Plan and the adopted DurhamWalks! Pedestrian Plan during the re-design of the Downtown Loop., July 21, 2009
- Letter to Durham Public Works re: adhering to the adopted Durham Comprehensive Bicycle Transportation Plan on the Carver Street Extension project., May 20, 2009
- Letter to Durham Transportation Manager re: using Federal stimulus funds for bicycle and pedestrian projects., March 17, 2009
2008
- Letter to Engineering and Stormwater Services re: two-inch lip requirement for driveways., October 10, 2008
- Letter to NCDOT re: bike lanes on Main St. , September 22, 2008
- Letter to Durham Area Transit Authority re: bikes on busses, September 22, 2008
- Letter to 21st Century Commission re: Implementation of Bicycle and Pedestrian Plans, September 24, 2008
- Letter from NC Turnpike Authority re: Triangle Parkway, August 21, 2008
- Letter to Mayor and City Council re: CIP Road Projects, Bicycle and Pedestrian Facilities, and American Tobacco Trail, August 21, 2008
- Letter to Triangle Transportation Authority re: Bicycles on Busses, August 19, 2008
- Letter to Durham Transportation Manager re: Anderson Street, July 25, 2008
- Letter to NC House re: House Bill 2408, allowing wide boat trailers, June 20, 2008
- Letter to NC Turnpike Authority re: Triangle Parkway from NC 540 to I-40, April 7, 2008
- Letter to Mayor and City Council re: Bicycle and Pedestrian Planner Position, March 31, 2008
- Letter to NCDOT re: Hopson Rd Grade Separation of NC Railroad/Norfolk Southern Track, March 31, 2008
- Letter to Mayor and City Council re: Proposed Widening of Alston Ave., March 31, 2008
- Letter from NCDOT re: Hillandale Rd. from I-85 to North of Carver St., March 25, 2008
- Letter to Metropolitan Transportation Advisory Committee re: Priorities for State Ranking, February 13, 2008
- Letter from NCDOT re: South Miami Blvd. from Methodist St. to Bethesda Ave., February 8, 2008
- Letter to NCDOT re: Hillandale Rd. from I-85 to North of Carver St., January 31, 2008
- Letter to Durham City Manager re: Alston Ave Widening , January 24, 2008
2007
- Letter to Durham City Council re: 2008 Two Thirds Bonds, November 30, 2007
- Recommendation to MPO TAC re: STP-DA & CMAQ Projects, October 31, 2007
- Recommendation to MPO TAC re: 2009-2015 TIP Priority Lists, October 23, 2007
- Letter to NCDOT re: Page Branch Creek Trail and South Miami Blvd., October 22, 2007
- Letter to NCDOT Division 5 re: Resurfacing Projects in 2007, April 5, 2007
- Letter to Durham City Council and Durham County Board of Comissioners re: Alston Ave Widening, January 24, 2007
2006
- Letter to NCDOT Division 5 re: Bicycle Planning Course
- Letter to USDOT Secretary Mineta re: TTA Regional Rail,February 5, 2006
- Letter to Mayor Bell re: Eno Trail Priorities ,February 10, 2006
2005
- Letter to Mark Greenspan re: Bike Racks,November 18, 2005
7. BPAC Press Releases
8. BPAC Interlocal Agreement
- Interlocal Cooperation Agreement to Reauthorize the Durham Bicycle and Pedestrian Advisory Commission, February 12, 2010
9. Ordinances
- Ordinance 13428 Amdendment 12 (.doc)
ADA Compliant Sidewalks, American Tobacco Trail Phase-E (bridge at I-40), Bike and Ped projects, Old Lyon Park Center, and more
December 20, 2007.
- Unified Development Ordinance
Article 10 Off-Street Parking and Loading, which includes requirements for bicycle parking.
Article 12 Infrastructure and Public Improvements, which includes information on the requirements for sidewalks and bicycle facilities.
10. Transportation Plans
Adopted Plans
- 2008 Resurfacing Projects - Durham County (spreadsheet)
- 2008 Resurfacing Projects - Durham County (map)
- NCDOT Resurfacing Guidelines
- Downtown Durham Master Plan (January, 2008)
- 2006 DurhamWalks! Pedestrian Plan
- 2006 Durham Comprehensive Bicycle Transportation Plan
- 2001 Durham Trails & Greenways Master Plan
Plans Under Review
- Duke Central Campus Plan (a work in progress)
- NCCU Master Plan
- B. Everett Jordan Dam and Lake: Master Plan
Transportation Plans & Funding Programs
- 2030 Long Range Transportation Plan (DCHC-MPO)
- 2007-2013 NCDOT Transportation Improvement Program (Division 5)
- 2008-2013 City of Durham Capital Improvements Program
11. Transportation Corridor Studies
- Anderson Street Calming Report, May 8, 2008
- Anderson Street Neckdown Assessment from Chapel Hill Rd. to Moorehead Ave., Feb 19, 2008
- East End Connector - NC 147 to US 70 (Miami Blvd)
- East End Connector - NC 147 to US 70 (Miami Blvd) renderings
- American Tobacco Trail Project - Phase E Pedestrian Bridge Over I-40
- Old Durham-Chapel Hill Road Bicycle and Pedestrian Facilities Study
- NCDOT Presentation on Adding Wide Shoulders to Existing Roads
- NCDOT proposed resurfacing list for 2008 (XLS spreadsheet)
- City of Durham Approved FY 2009 Transportation Projects
